Field-proven FAT & SAT procedures, I/O verification checklists, loop test sheets, and a punch list tracker — built from 15+ years commissioning SCADA and control systems, ready to rebrand and use on your next project today.
Get the Toolkit — $99Complete Factory Acceptance Test template: panel inspection, power-up, network & comms, I/O simulation, logic, alarms, and HMI test sections with sign-off tables. (Word)
Site Acceptance Test template: installation verification, loop checks, live functional tests, performance test window, and formal handover. (Word)
Point-by-point test record for every AI/AO/DI/DO with automatic pass/fail summary. (Excel)
Loop index plus a 12-step per-loop sheet covering field-device-to-HMI verification, alarms, and failure modes. (Excel)
A/B/C categorized deficiency tracker with automatic open-item counts for handover meetings. (Excel)
How to customize each document, regulated-environment tips (NERC CIP evidence), and single-organization license for unlimited projects.
Send us your FAT/SAT procedures, I/O lists, and control narratives. You get a marked-up review, a gap list against industry practice (and NERC CIP where applicable), and a walkthrough call. Scope and turnaround are set to your project, and quoted before any work starts.
Request a quote →